 
        
        
      
    
    TOP FORCE TRANSDUCER
PDI offers Top Force Transducers for use with the Pile Dynamics Analyzer-Dynamic Load Tester (PDA-DLT)
available in three sizes:
- 91 cm (36″) – 4,000 tons (includes 8 strains) 
- 61 cm (24″) – 2,400 tons (includes 8 strains) 
- 41 cm (16″) – 1,150 tons (includes 8 strains) 
DESCRIPTION
Top force transducer method eliminates concrete build-up or excavation on drilled concrete piles. Using Pile Dynamics, Inc’s Top Force Transducer allows for quick setup. When used with the Pile Dynamics Analyzer – Dynamic Load Tester (PDA-DLT), the Top Force Transducer improves force accuracy and reduces labor costs. Force measurements may be taken via bolted-on gages, load cell, dolly, or from ram measurements.
Advantages Include:
- No “windows” in casting provide more accurate force 
- Area and modulus are identifiable 
- Less pile preparation required 
- Eliminates excavations 
- Accelerometers mounted near the top of the pile, no longer requiring two diameter distance 
- Eliminates errors due to bending 
Visit the PDI Website for more information.
 
                        